2 bedroom Bungalow For Sale
Offers in excess of £280,000
A beautifully presented two-bedroom detached bungalow in an exceptional Horseshoe Pass setting, offering the perfect blend of modern living, rural tranquillity and outdoor lifestyle. With far-reaching countryside views, a generous tiered garden, detached summerhouse and stylish, move-in-ready accommodation, Gaia is an ideal home for couples, walkers, lifestyle buyers or those seeking a peaceful North Wales retreat.
Set amidst the spectacular scenery of the renowned Horseshoe Pass, Gaia offers something increasingly difficult to find — a detached home surrounded by open countryside, with the landscape and outdoor lifestyle right on the doorstep.
Whether you're looking for a permanent home away from the hustle and bustle, a base for exploring the mountains and walking routes of North Wales, or a characterful holiday retreat, this beautifully maintained property provides an enviable setting from which to enjoy it all.
Inside, approximately 830 sq ft (77 sq m) of thoughtfully arranged accommodation combines contemporary styling with a number of features that give the home a warm and welcoming feel.
The spacious lounge is a particularly inviting room, centred around a wood-burning stove and benefiting from large patio doors which fill the space with natural light and open directly onto the outdoor seating area. It's a room designed for both relaxed evenings at home and making the most of the spectacular surroundings.
The modern fitted kitchen features shaker-style cabinetry, solid wood worktops, integrated appliances and a breakfast bar, with the kitchen flowing naturally into a generous dining area. This sociable layout works equally well for quiet breakfasts, entertaining friends or enjoying long meals after a day exploring the surrounding countryside.
There are two well-proportioned double bedrooms, with the principal bedroom offering generous proportions, fitted mirrored wardrobes and pleasant views across the surrounding greenery. The contemporary bathroom has also been stylishly updated and includes a panelled bath with shower over, wash basin and WC.
The outdoor space is where Gaia really comes into its own.
The property enjoys a large, attractive tiered garden designed for easy maintenance, incorporating areas for sitting out, entertaining and simply taking in the peaceful rural surroundings. The patio seating area provides an ideal spot for morning coffee, evening drinks or relaxing after a day on the hills.
Adding further flexibility is the detached summerhouse, offering a genuinely useful additional space that could work as a home office, creative studio, hobby room, reading room or occasional guest space. For anyone looking to embrace a more flexible rural lifestyle, it is a particularly appealing feature.
And then there is the location.
The Horseshoe Pass is one of North Wales' most iconic landscapes, renowned for its dramatic scenery, walking routes and access to the great outdoors. From the doorstep, buyers can enjoy a lifestyle centred around countryside, fresh air and exploration, while the historic town of Llangollen is close by for everyday amenities, independent shops, cafés and restaurants.
Despite its rural position, Gaia remains conveniently placed for access to Wrexham, Chester and the wider North Wales region, making it possible to enjoy the best of both worlds — peaceful countryside living without being completely cut off from the outside world.Key Features
Gaia is more than a two-bedroom bungalow — it is an opportunity to embrace a slower, more outdoor-focused way of life. The combination of its spectacular location, manageable garden, versatile summerhouse and modern interior makes it particularly appealing to couples and buyers looking for something beyond a conventional suburban home.
For those seeking a permanent rural escape, a weekend retreat or a base from which to explore the mountains, valleys and historic towns of North Wales, Gaia offers a rare opportunity to make the Horseshoe Pass lifestyle your everyday reality. EPC rating: E. Council tax band: D, Tenure: Freehold,
A bright and welcoming entrance hallway finished in neutral tones with attractive wood-effect flooring. The space provides access to the principal accommodation and creates an excellent first impression, enhanced by a feature archway and natural light from the glazed front door.
A spacious and inviting reception room enjoying an abundance of natural light from the large patio doors overlooking the surrounding greenery. The room centres around an attractive wood-burning stove with timber mantle, creating a warm and cosy atmosphere, while providing ample space for both seating and entertaining.
A modern fitted kitchen appointed with a range of shaker-style wall and base units complemented by solid wood worktops. Features include an integrated oven, electric hob with extractor hood, inset sink and breakfast bar seating, offering a practical and stylish cooking space.
Open-plan to the kitchen, the dining area provides excellent space for family meals and social gatherings. Patio doors create a bright and airy feel while offering direct access to the outdoor seating area, making it ideal for indoor-outdoor living.
A generously proportioned double bedroom beautifully presented in neutral décor. The room benefits from fitted mirrored wardrobes, ample floor space for additional furniture and large windows that frame pleasant views of the surrounding countryside.
A well-sized double bedroom offering versatile accommodation, suitable for use as a guest room, children's bedroom or home office. The room enjoys a peaceful outlook and plenty of natural light.
A stylishly modern bathroom fitted with a contemporary white suite comprising a panelled bath with shower over and glass screen, wash hand basin with vanity storage and low-level WC. Complemented by attractive wall tiling and modern fittings throughout.
A detached and versatile summerhouse providing valuable additional space separate from the main residence. Ideal as a home office, hobby room, studio, gym or occasional guest accommodation, offering flexibility to suit a variety of lifestyle needs.
The property enjoys attractive outdoor seating areas designed to make the most of its picturesque surroundings. With views across the neighbouring countryside and easy access to the stunning Horseshoe Pass landscape, the outdoor space provides a peaceful setting for relaxation and entertaining.
| Tax Band | % | Taxable Sum | Tax |
|---|
Struggling to find a property? Get in touch and we'll help you find your ideal property.